|
Humiston & Moore Engineers (H&M) is providing technical assistance to
an environmental consulting team working to manage and enhance the Clam
Bay Estuarine System. The inefficient flushing of the bay system is
causing water quality problems, fish kills, and areas of dying
mangroves. H&M provided hydrodynamic modeling of Clam Bay to evaluate
the dependence of water levels in the bay on freshwater inflow into the
estuary. A two dimensional hydrodynamic model was developed and
calibrated to model the existing conditions and assess the
effectiveness of various alternatives. The modeling and analysis
evaluated the effects of proposed enhancements to the bay system on
water levels within the bay system, stability of the inlet and impacts
on adjacent coastal areas. This information is to be correlated with
salinity data and biological data on the vitality of the mangrove
community in an effort to determine how retention of freshwater in the
inner bay system may be related to mangrove health. |
 |
 |