Lely Barefoot Beach Dune Project (2001)

Dune Reconstruction Project

This project included coordination with the Lely Barefoot Beach Property Owners Association to reconstruct a dune following impact from Tropical Storm Gabrielle in 2001.  The sand was retrieved from the overwashed area. The dune is approximately 4500 feet in length.

 

Purpose

Post storm dune restoration.

 

Project Tasks

  • Dune Reconstruction Design

  • Dune Planting and Exotics Removal

  • Coordination with Property Owners, 

Contractors, and State 

Regulatory Agencies

Scope:

  • Advise Property Owners

  • Dune Design

  • Permitting

  • Construction Observation